Participate | |||
S. NO. | Domestic Rs. Per sq. Meter | Foreigin US $ sq. Meter | |
---|---|---|---|
01 |
Ready to use built up stands inside hall. |
10000 | 200 |
02 |
Bare Space inside hall |
9700 | 180 |
03 |
Open paved area outside hall (Non AC). |
7500 | 100 |
Electric Power :
(For 10 hrs/day for 3 days) Rs. 2400/- Per KW/USD 40 PER KW+ GST @18% (For 24 hrs/day for 3 days) Rs. 4800/- Per KW/USD 80 PER KW+ GST @18% Water Connection Charges : Rs. 18000/- Per Connection I USD 250 + GST @l8% Water Consumption Charges : Rs. 2500/- Per Tap Per Day I USD 40 Per Tap Per Day+ GST @18% Compressed Air: Rs.13000/•Per Connection Per Day /USD 200 Per Connection Per Day+GST @18% |